This is the mounting for gold wire, with pickups on the two near corners. The two lengths are quite different. |
|
|
|
This is a kind of optical resonator that fuctioned as a filter. The earliest form shown here used plastic rods and retroreflectors and was mounted vibration-free. |
|
|
|
Early mounting of the optical resonator (1986); central crystal is a quartz sphere with a facet for each mirror. Note He-Ne laser which with a photodiode detected crystal vibrations. |
|
|
|
1986 early crystal mounting, suspended by tungsten filaments |
|
|
|
Clearing the inside of a camping trailer in Denton TX to fit much of the project inside prior to move to NM, summer '86 |
|
|
|
|
'85 in Denton TX; first of three constructions of an orgone box, equilateral octahedron 8' on a side, 72 metal layers, 2 layers of newsprint between each, 1400 lbs in final version; antenna went along one axis |
|
|
|
Me with friends in Denton helping with the move to NM, October '86 |
|
|
|
Dan Canales in Denton, summer '86 with the first assembly of the orgone box |
|
|
|
First of several sets of 144 mirrors (each set had large and small versions); these are cut flat mirrors. Another set was first surface platinum on plate glass. |
|
|
|
Assembled box on flat-bed trailer with the camping trailer parked in a slum in Las Cruces NM, 1986-7 |
|
|
|
|
Ball mounted vibration-free through floor of trailer in NM, '87 |
|
|
|
Box stored a few months during my move to NC, '87; rain damaged, had to remake all the layers |
|
|
|
Ball with plastic retroreflector arrays; too cheap, didn't work |
|
|
|
Relayering the right way now in Cleveland NC, 1988 |
|
|
|
Inner layer of box now sheet stainless steel |
|
|
|
|
Reassembly of orgone box in its new dome, Cleveland NC 1989 |
|
|
|
Assembly of orgone box in dome |
|
|
|
Final mounting of box; rotates on mounts on opposite verticies, hangs from top of dome on cables, can point in any direction |
|
|
|
Beginning of geodesic frame for dome; winched up central pole and built from top down (by myself!) |
|
|
|
Progress on dome, winter '89 |
|
|
|
|
Progress on frame. Then had to figure out a foundation! |
|
|
|
Scrambling around on the frame |
|
|
|
Jeff Ayers helping cover the dome |
|
|
|
Completed dome with trailer behind |
|
|
|
Final configuration of optical resonator; aluminum rods, platinum mirrors, quartz mounted on tapered copper rods |
|
|
|
|
Laser spot on crystal, close up |
|
|
|
April 1990, full test....nothing happened. |
|
|
|
Full test 1990 |
|
|
|
Full test 1990 |
|
|